Ken Snyder |
These stairways will be
glass-enclosed. That means that people on the outside will be able to see the
people on the stairs, and that the people on the stairs will see the people
outside – and also have nice view of the Wellsville Mountains and the south end
of the valley. An absolutely great view!
The news is that yesterday
(finally!), we started installing the grand staircase. The first step is to
install some columns to which the staircase will attach. I took some pictures
of the workers installing the base of the columns, and also of the vertical
view of the columns (see attached).
The pieces of the grand staircase
will be installed in segments. The first segment being installed this week will
be Level 1 (the basement) to Level 2 (the ground floor). In about two weeks, we
will start installing the 2nd segment which will connect Level 2 to
Level 3. The 3rd segment will follow about 2 weeks after that.
Please watch for this installation over the next 6-7 weeks. I think you’ll be
amazed by our stairway to heaven.
No comments:
Post a Comment