Jon M. Huntsman School of Business

learn about the latest and greatest from the School of Business

Tuesday, July 28, 2015

The Glass Ceiling (Canopy)

As a follow-up to my blog last week about the new northwest entrance to the business building complex, this week I want to tell you about the roof over the entrance. It’s made of glass. And it serves as both a roof and a ceiling over the enclosed spaces of the entrance, as well as a canopy over the exterior entryway and the exterior space between the Eccles business building and the new Huntsman Hall.


This is a story better told by pictures, so I have attached a few.

Canopy over the front entryway
Construction workers installing the glass panels of the roof/ceiling/canopy
Several glass panels installed

Cool – isn’t it!?

Ken Snyder

Monday, July 20, 2015

The Northwest Passage

As I mentioned in one of my blogs last month, one of the big projects during the summer is redoing the northwest entrance. We want the northwest entrance to be one entrance with doors into each of the two buildings. It is necessary to make the building complex seamless. We do not want there to be two different entrances. By “one entrance” we mean one walkway, one set of steps leading up to the building complex, one roof covering, and one concrete slab across the entire breadth of the entrance. 
Current NW entrance under construction

This entrance is critical to the success of our new building. When we were doing the programming for the building, we measured traffic in and out of every entrance to gain a better understanding of how students used the Eccles building, and to project how students might use the new building complex. We discovered that 75 percent of the students entering the Eccles building entered through the northwest entrance. Because most of the business classes will shift to the new classrooms in the new Huntsman Hall, and because the northwest entrance will be the main entrance to those classrooms, we project that about 85 percent of the student traffic in and out of the business building complex will be through the northwest entrance. This entrance will be well-used! 
NW entrance rendeer
In order to make the entrance more user-friendly, we have made some big changes. First, we more than doubled the number of doors, thereby increasing the capacity of the entrance. There should be no more waiting in lines to get in or out of the business building. Second, we added a snow melt system to the stairs and to the landing area at the top of the stairs. We also added some walk-off mats in the vestibule coming into Huntsman Hall. There should be no more puddling of snow melt inside the halls of the business building. Third, we created an open atrium-like space coming into the building complex. This space will be used for banners, screens with announcements, an informational kiosk, and so on. Students will no longer enter into the building complex and immediately be thrust into the classroom hallways. And fourth, and most importantly, the northwest entrance will also serve as one of the main passageways between the two buildings.

Students will benefit tremendously from the increased usefulness and capacity of the new northwest passage.





Ken Snyder

Wednesday, July 8, 2015

Grinding It Out

I was trying to think of something exciting to report. Nothing came to mind. I reviewed the list of things we worked on during the past week. Nothing jumped out and said “write about me.” Then I realized that a lot of the big exciting things are done, and we are now in the phase of taking care of lots of little details. 

Let me use our construction meeting agenda from last week as an example. The construction meeting is our weekly meeting that includes us (the “users”) from the Huntsman School, university facilities representatives, architects, various people from the general contractor, and the state DFCM representative.

We covered 23 items on the agenda. This is actually fewer than what we’ve had on the agenda in recent weeks. The previous two weeks had 35 and 37 items respectively.


Here are some of the items:

· Holes for return air in metal panels

· Switch to LED lighting in corridors and public areas

· Confirm placement of fire extinguisher cabinets

· Resolve conflict between duct and light fixture placement in large tiered classrooms

· Change doors in stairwells to meet fire code

· Approve final Dean’s Suite design

· Handrail on bridges between buildings on Level 3

· Ensure power and data to the Huntsman Library

· And so on…

Maybe you can see why nothing jumped out at me and said “write about me.”

I am happy to report that of the 23 items on the agenda, eight items were completely closed. six other items were decided and acted upon and just needed the paperwork to catch up to the work in order to be closed. All of the other items were designated as action items and assigned to the appropriate people for action.

I suspect every weekly meeting will be a lot like this from now on until the building is finished. Grinding through lots of little details…



Ken Snyder